It examines “a wide range of potential future system conditions and compares possible pathways to an increasingly greener resource mix. October 25, 2021 capacity expansion model primer system & resource outlook update Nyiso’s recent transition from the class year process to its new cluster study interconnection process will improve the overall timeline and information provided to developers, but it retains the existing deliverability test methodology.
(bunni3jpg) big boobs : intelligentduck
The first is how the nyiso will need to keep the grid reliable while moving towards the clcpa mandates.
Utilizes industry data and nyiso load forecasts, representing a future with high demand (57,144 mw winter peak and 208,679 gwh energy demand in 2040) and assumes less restrictions in renewable generation buildout options.
Nyiso will request updates to the status of proposed projects, such as local transmission owner plans, proposed generation and transmission additions, development of discrete large loads, demand response, and other status updates relevant to reducing, or eliminating, the reliability need.